Last weekend we were able to get the in-floor heat put in on the main floor. This covered 3 areas--the ensuite, the main floor bathroom, and the mudroom. Those floors were a little bit chilly with the colder weather we have been having.
We had to snake the pipe through all the floor joists in the basement, but we were able to get that all done on Saturday. Todd then worked at insulating the ensuite area, so it is ready to go. We still have to insulate the other to areas, but we have turned the system on, so it is making a big difference.
Todd also put up closet organizers in the main entry closet, and back in the mud room. We were just stacking our coats in a big pile before that, so it is nice to have that finished!
Thursday, December 20, 2007
Subscribe to:
Posts (Atom)