Sorry, I have tried posting several times, but it just hasn't worked!! We had our final inspection completed the first week of January, and surprisingly enough, we only had a few things we needed to "fix". We needed to install a landing at the garage entry, put the swing hinge (self shutting) feature on the garage door, install a smoke detector in the basement, put up hand railings on the steps down to the basement, and get up the hood fan in the kitchen.
The landing out in the garage. 
The hood fan in the kitchen. We have to still put the vent up, but we need to move the piping to the exterior of the house over a little bit. 
The last door that needed to be put up, other than closet doors. We continue to work on lots of little things. Baseboards, unpacking, getting the garage cleared/cleaned out, etc. We are really enjoying being out here, and are getting fairly settled--although there is always something to do!!!