Todd and Dad were able to get two walls completed yesterday. One is quite a tall wall (23') while the other was around 13'. This is one side of the house (the utility room and office outer walls). They were back at it again early this morning, so we'll have to see how many they got done today.
Hopefully the cribbing is being done today, so that the walls can perhaps be poured tomorrow afternoon. It should be poured by Monday at the latest, so maybe we can start putting the floor up then.
We are having some warm weather here, which is nice, but it was a little bit windy yesterday. Sheets of plywood were flying overhead, and the neighbours styrofoam blocks for his foundation ended up on our lot!!! The wind has died down today, so it is much better--although the wind cleared up a fair bit of the snow.
You can check out the weather by clicking on the weather links to the left of the page. I placed those links there for everyone's convenience. Feel free to post a comment every so often, even if it is just to say "Hi". We would like to hear from you.
We had our appointment at Canyon Plumbing to pick out faucets/tubs/sinks etc on Tuesday. That was quite the challenge. It is hard to know exactly how you want things to look, when you really haven't started on anything yet. It was fun though. Todd picked out some nice faucets/tub fixtures for the bathrooms. I picked out the kitchen sink/faucets and the tubs (which are also nice!!!). I will hopefully get to some cabinet makers next week, to start working on a kitchen design. If anyone has any suggestions, please pass them on to me. I am having a hard time deciding what I want!!
We are still waiting to hear back from 2 different companies on geothermal quotes. One of those companies is also giving us a quote on just forced air heating.
Well, that is all for now. I will probably have more for you on Saturday!