Monday, November 27, 2006
Basement ready for weeping tile
It is still cold down here!! The basement was tarred on Saturday, so now we need to get the weeping tile put in (gravel around the basement). Todd needs to fill in a little bit of dirt closer to the house so that the rock thrower can get in close enough to put the gravel in. Dad L is coming down tomorrow to continue to work on the floor. Hopefully we will be able to have the sub floor in place so that the plumber can come in on Thursday, and then we can pour the basement and garage floors on Friday (wishful thinking I'm sure!!!).
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment