Sunday, June 03, 2007

Lots of little things...

We have been working on lots of little things that need to get done--backing at the peak, backing along the south wall with all the windows, framing in the bathtubs, etc. Todd also started to Tyvek the outside of the house. We put in Joshua's window as well. We are down to only having 4 windows left, and 2 doors. Jacob's window can't go in until after the drywall has been delivered, as they are going to lift the drywall through his window so that they have some drywall sheets on the second floor.


Todd Tyveking the south wall.
Framing around the 2nd floor bathtub--we are going to have a little shelf to place toys, shampoo, etc on to.
Backing around the windows on the south wall. Lots of little cuts with angles.....
Backing at the peak (kind of hard to see, but it is there...)
Tyveking the outside of the house.


This is the west wall. It now has Joshua's window in, and the tyvek has been started.


Nathan enjoys playing in his playpen out at the house. He plays with his toys, and has his naps in there!