Taping upstairs.
Taping in upstairs bathroom
Taping in Jacob's room and closet
Siding on west wall of garage--we finished this today.
The last door was put in place last night.Track the progress as we build our house. The lot is located just east of Okotoks, and is about 3.06 acres.
East wall of the games room. Door leads into Nathan's room.
Door into the bathroom. That is the only room they haven't started on yet upstairs.
Other side of staircase wall in the "games room". We will probably put our TV here. There will be railing on the lefthand side.
Other side of bay window, with the front entry of the very left.
The fireplace. All of that drywall will be covered with rock--some day...
West wall of the great room.
Going up the stair case. There will be railing to the right of this, in the space you see.